Hey guys, I have a 120 long and am getting a 120 cube. When transferring should I use new sand? I would like to use whatever I could to save money but don't want to cause a spike in the long run. I will also be adding about 50 lbs of new rock to the existing rock. Would I need to let everything cycle or should I be ok to transfer everything over ASAP? Thanks for the help, shane


