- Joined
- Sep 29, 2016
- Messages
- 828
- Reaction score
- 1,095
I'm looking at setting up a frag build on the 2nd floor. House was built in 2010 and the rack will be against the wall. Here are the system specs:
Below is the spot that the frag system would go, same direction/orientation. Currently there's a cabinet that can fit a 75g on top being used to dry start a never ending project...
Thoughts?
- (2) 50g Lowboys (48x24x10)
- Fiji 36" Sump (35-37 gallons completely filled)
- Stand to hold both tanks vertically (2x4's, 1x4's, plywood)
- Stand to the side to hold the sump
Below is the spot that the frag system would go, same direction/orientation. Currently there's a cabinet that can fit a 75g on top being used to dry start a never ending project...
Thoughts?

