I do not use the APEX to control my dosing but I can see on my PH graph when my dosing pump is running with spikes in PH.
Is there any way to capture my dosing schedule into my apex ideally it would be awesome if I could add data points to this graph but I am sure that is unlikely.
I think it would be very handy if I could somehow say I does at midnight so I expect to see an increase of PH at that time and if I do not alert me...
x
Is there any way to capture my dosing schedule into my apex ideally it would be awesome if I could add data points to this graph but I am sure that is unlikely.
I think it would be very handy if I could somehow say I does at midnight so I expect to see an increase of PH at that time and if I do not alert me...



