Hey long time lurker, first time poster.
@Elder1945 and also
@Jeff@CoralVue
Do you happen to have any practical working examples of these in use?
I have GHL products, including KH director and pre-order for ION Director and can't see how to mount everything.
Option 1 increases the distance between each 'Director' and its doser, which then means the distance between the doser and the reagents must be shortened, which is hopefully still fine It also uses up 2 faceplate space which could be used for other controllers then
option 2 is how most people mount them now, stacked, and could be acheived if I was to cut into the single blank faceplate slot to create space for each 'director' unit to rest on its own doser. This frees up 2 complete faceplate spaces at the bottom, which may be required for reagent solution, or, could fit 3 Ecotech controlers.
Option 3 is how I think my profilux, actual dosers and Ecotech controllers would be mounted.
As there is no custom faceplate for Doser Maxis, I assume we must hide these near our mixing stations.

. Is there a plan to release a faceplate for the doser Maxi?
Are any of these layouts not feasible or is one more practical than the other?
Also, as calibration of the directors is required every 2-4 weeks, and dosing containers need to be refilled around the same time frame, does the magnetic face of the cabinet come off easily and allow for easy access to refill dosing container etc? Does the face of the cabinet sit steady and balance with a KH Director Set and Ion Director set and logical cable layout feeding into each dosing container. Noting that certain dosing tubes (KHD Reagent) have limitations on their length and you cannot necessarily coil excess tubing to allow the face place to be moved 2 feet away?
I'll happily throw, what will amount to around $1,500 at this, but would certainly need an indication that it will work in a practical sense.
Keen to place my order.







