Hey everyone so I recently was gifted with this awesome 120 tank. It already has some holes drilled into it but they are on the bottom left and right side, halfway between the front and back. Ive never had a tank with bottom holes drilled so I wanted to know the best way to go about plumbing it. Heres some photos so you can see exactly how the holes are. There are 4 of them total, two on each side.



