- Joined
- Mar 22, 2017
- Messages
- 1,677
- Reaction score
- 4,545
- Location
- Baltimore, MD
- What state or country do you live in
- Maryland
So I am looking to install a CO2 scrubber and integrate with Apex using a 24v solenoid. Everything is 3/8" so that rules out the 1/4" Neptune one.
So inspired by BRS I am looking at a 24v one:
https://www.mcmaster.com/5489t493
So instead of using a 24v power supply, anyone see an issue with powering it using one of these off of the EnergyBar 832:
https://www.bulkreefsupply.com/dc24-to-bare-wire-accessory-cable-neptune-systems.html
Thanks for the Peer Review
Tom
So inspired by BRS I am looking at a 24v one:
https://www.mcmaster.com/5489t493
So instead of using a 24v power supply, anyone see an issue with powering it using one of these off of the EnergyBar 832:
https://www.bulkreefsupply.com/dc24-to-bare-wire-accessory-cable-neptune-systems.html
Thanks for the Peer Review
Tom
Last edited:


