Finally after 3 years I have decided to hard plumb the tank. I give credit to all that have done this. This is a very time consuming and challenging project but I am loving the results.
I still have to change 3 Bulkheads, yeah, that is a ton of fun!!!! Then I have to Plumb the left return and both drains. I have lots of quick disconnects and ball valves in the system too.
This all started with the recent purchase of a skimmer since I went back to MH. Here is the project half way thru, please ignore the wires all over the place as that will change soon, I have my other EB8 on the way to help with that issue. The skimmer is Hard plumbed externally , That is why you do not see it in the pics.
I still have to change 3 Bulkheads, yeah, that is a ton of fun!!!! Then I have to Plumb the left return and both drains. I have lots of quick disconnects and ball valves in the system too.
This all started with the recent purchase of a skimmer since I went back to MH. Here is the project half way thru, please ignore the wires all over the place as that will change soon, I have my other EB8 on the way to help with that issue. The skimmer is Hard plumbed externally , That is why you do not see it in the pics.

