I plan on tearing into my existing build today. Currently I have Heating and Cooling control, Power Control and ATO control. The existing build also includes a local touch screen.
Now that I have the new HAT Goby, I am planning on expanding to also control lighting, PH and Doser.
My first issue out of the box is power. I barely have enough amperage currently to power what I have. I need to increase to power to 6 Amps or so based on my calculations.
Mike - If your watching, is there a way to introduce a secondary and dedicated power source to your Mars Aqua adaptor? My lighting is the largest power drain on my system.