- Joined
- Jan 21, 2019
- Messages
- 254
- Reaction score
- 667
- Location
- Appleton
- What state or country do you live in
- Wisconsin
mixing station tanks plumbed. RODI unit won't come downstairs until ready to start filling tank. Because the tanks came with bulkheads already, I drilled out a 1" threaded plug, attached a float valve, and screwed it into the inside of the bulkhead of the RODI tank instead of drilling another hole for the float valve in the tank.




