- Joined
- Feb 4, 2021
- Messages
- 47
- Reaction score
- 51
- Location
- Beverly Hills, Michigan
- What state or country do you live in
- Michigan
I have an innovative marine INT tank which has a 3/4” return line that runs through the bottom of the tank. I have the bulkhead installed — do I need to cement the 3/4” PVC that is between the bulkhead and the locline?

