Planning a new tank and while I'm waiting for the tank itself to be built I've kept busy 3D modelling the stand and the plumbing. I'm hoping someone would take a quick look and offer any suggestions, particularly on the return section. The return pump will be feeding the display, a small frag grow-out tank as well as a manifold. One port on the manifold will drive a reactor with carbon and GFO, the other will probably just be used for water changes.
The red pipe is the emergency drain off the overflow, dark blue is 3/4 return plumbing, medium blue are 1" drains and the one light blue is the drain from the frag tank.

The red pipe is the emergency drain off the overflow, dark blue is 3/4 return plumbing, medium blue are 1" drains and the one light blue is the drain from the frag tank.


