Ok guys I have a build thread going on also. I'm planning on drilling my allready drilled 240g system it has duel over flow with 1" and 1 1/2 per overflow it also had a 2" in the center. My though is to do a ols and cls with 2 return pumps (1 for each) the reason behine this is cls for water flow and ols for use of a sump and its allready ready for ols. So here are my plans. Input is needed good or bad. Current as it sits
Plans for drilling
Plans for drilling

