I've been surfing the web for a hang on overflow for both of my systems (125 and 120). Tonight while trying to make a decision, I thought of drilling both. Here is my problem: Is it even possible to drill my 2 systems with the water still in it if I was to drop the water level to half? I had planned on moving from my DIY pvc overflows (somethings you just have to try) to a hang on overflow (pvc just isn't the best in the FTS, but it works), but worried from stories I've heard, so looked into the drilling. Anybody ever tried drilling a half full tank? Should I just deal with the coraline covered PVC? Any other thoughts or comments? Thanks
BTW: the pvc overflows still work great and I wasn't sure I was even going to replace. Thinking of fragging GSP and Xenia over them. :xd:
MODs: Please move if in wrong section.
BTW: the pvc overflows still work great and I wasn't sure I was even going to replace. Thinking of fragging GSP and Xenia over them. :xd:
MODs: Please move if in wrong section.



