- Joined
- Mar 30, 2022
- Messages
- 54
- Reaction score
- 25
- Location
- 45050
- What state or country do you live in
- Ohio
So I have just setup a new tank, I combined a 65 and a 75 into a 300. I had a single Reefmat 1200. And it was processing about 950 GPH. This lead to rapid use of the roll, exceeding 200 inches.
I decided to install a second Rollermat 1200 and split the load. Now the issue became getting the two to process the same amount of roll per day, so that the flow was even. At first, I just split the main drain and thought gravity would do the rest. Well, it did, but it sent most of the flow to the right. Pobably the path of less resistance. So, I was able to recycle the plumbing from the 65 and the 75 (no money spent this time - major victory by itself, but I have extra valves now b/c they were plumbed in a different application and I put them too close to cut and reuse) and get valves installed on the returns to coltrol the flow. After it was re-plumbed with valves, the flow still was sending most to the left. So, I restricted the valve to the left drain a bit and evened the flow.
RET-1 is my left return to the tank. RET-2 is my right return. And RDRAIN is the right drain to the right Reefmat.
Here is the install:
I have the return split between the two. And the overflow from the tank is also plummed into the left rollertank. So no water comes from the tank that is not sent through one of the Reefmats.
jvc
I decided to install a second Rollermat 1200 and split the load. Now the issue became getting the two to process the same amount of roll per day, so that the flow was even. At first, I just split the main drain and thought gravity would do the rest. Well, it did, but it sent most of the flow to the right. Pobably the path of less resistance. So, I was able to recycle the plumbing from the 65 and the 75 (no money spent this time - major victory by itself, but I have extra valves now b/c they were plumbed in a different application and I put them too close to cut and reuse) and get valves installed on the returns to coltrol the flow. After it was re-plumbed with valves, the flow still was sending most to the left. So, I restricted the valve to the left drain a bit and evened the flow.
RET-1 is my left return to the tank. RET-2 is my right return. And RDRAIN is the right drain to the right Reefmat.
Here is the install:
I have the return split between the two. And the overflow from the tank is also plummed into the left rollertank. So no water comes from the tank that is not sent through one of the Reefmats.
jvc

