[FONT=verdana, geneva, lucida, lucida grande, arial, helvetica, sans-serif]Hi all
Got these for my new 150 build but decided to go with the ATI Hybrid fixture in the end.
Manufacture dates are Feb 28th and 20th 2013 but they have mostly been sitting around.
Asking $600ea or take both for $1150
Thanks!
Sorry for the pics, PM me for better ones if you need them.
[/FONT]
Got these for my new 150 build but decided to go with the ATI Hybrid fixture in the end.
Manufacture dates are Feb 28th and 20th 2013 but they have mostly been sitting around.
Asking $600ea or take both for $1150
Thanks!
Sorry for the pics, PM me for better ones if you need them.
[/FONT]


