- Joined
- Mar 1, 2018
- Messages
- 6
- Reaction score
- 3
- What state or country do you live in
- Washington
Little miscommunication on my tank order. Holes for external overflow will fit a 1.25" bulkhead rather than 1.5" bulkhead. I've already plumbed the system, to the basement, with (3) 1.5" drains.
Curious if anyone sees an issue with using a 1.25" to 1.5" pvc adapter just below the bulkheads so I don't have the replumb the entire drain system. This transition would occur above the gate valve used for fine tuning the system.
Thoughts?
Curious if anyone sees an issue with using a 1.25" to 1.5" pvc adapter just below the bulkheads so I don't have the replumb the entire drain system. This transition would occur above the gate valve used for fine tuning the system.
Thoughts?



