- Joined
- Apr 30, 2012
- Messages
- 2,722
- Reaction score
- 722
- What state or country do you live in
- Alabama
OK ,I have a mag 18 in my display 120g with a 40 g sump, with a manifold splitting off
Right now its just running a dual reactor and my return line,
Im wondering if its going to be enough to send to the frag tank.
Should i use pvc or vinyl tubing..theres only a 1inch bulkhead for the drainand 3/4id for return,I know i dont need much flow in it since i will have powerheads but im just concerned about the pump.
The main tank valve is open 3/4 or a little more then half way if that helps anyone
Thanks for any input..
Right now its just running a dual reactor and my return line,
Im wondering if its going to be enough to send to the frag tank.
Should i use pvc or vinyl tubing..theres only a 1inch bulkhead for the drainand 3/4id for return,I know i dont need much flow in it since i will have powerheads but im just concerned about the pump.
The main tank valve is open 3/4 or a little more then half way if that helps anyone
Thanks for any input..


