So I had a question in regards to a Georg Fischer wye check valve placement
Im currently in the middle of setting up the plumbing on my 80 gallon frag tank and would like to incorporate this check valve as an added fail safe. My question is, can it be installed in the overflow on the return line or should I install it externally? I was thinking between the two 1/2" valves on my manifold with the wye part of the check valve facing up?
My preference is in the overflow area. the entire valve can be removed easily from the bulkhead for maint, since its just a push fit to the return bulkhead.
Im currently in the middle of setting up the plumbing on my 80 gallon frag tank and would like to incorporate this check valve as an added fail safe. My question is, can it be installed in the overflow on the return line or should I install it externally? I was thinking between the two 1/2" valves on my manifold with the wye part of the check valve facing up?
My preference is in the overflow area. the entire valve can be removed easily from the bulkhead for maint, since its just a push fit to the return bulkhead.



