- Joined
- Jun 17, 2020
- Messages
- 558
- Reaction score
- 253
oh man.. thanks for the heads up! every second counts then huh..Between stage 2 and 3 of the test, you have to add the reagent, and then shake the vial for 2 minutes. The ULR phosphorus meter shuts off after 3 minutes if you don't have the vial back in and hit the button. The ULR Phosphate meter gives you 7 minutes.
If the meter shuts off, you need to collect a new sample and use another packet of reagent.

