Hard plumbing

  • Thread starter Thread starter Mandee
  • Start date Start date
  • Tagged users None

Mandee

Active Member
View Badges
Joined
Jun 30, 2015
Messages
253
Reaction score
116
Location
Millbrook NY
Rating - 0%
0   0   0
I'm trying to figure out WHAT and How much to order to start plumbing my reef ready 220 gallon tank.
Any help?
I'm really new to this so any help is appreciated
 

Attachments

  • 1438970191406.jpg
    1438970191406.jpg
    37.7 KB · Views: 183
  • 1438970204898.jpg
    1438970204898.jpg
    57.3 KB · Views: 179
Fist question is do you have the bulkheads?
 
Your best bet is to just order the two bulkheads you need and buy everything else from the local Home Depot. You can measure and get a general idea of how much straight pipe, 90s, 45s, unions, etc but until you go and put everything together, you will find that you are still missing pieces lol. I must have made 20 trips back and forth to HD before I was finished.
 
What I normally do when planning plumbing for a tank is to put my sump and other equipment in place and then draw a rough sketch of what I want to do. This will give me a good idea of what valves, 90's and other fittings I will need. I usually pick up s few extra in case plans change during plumbing. At the very least i can say you're going to need 2- 1" bulkheads and 2- 3/4" bulkheads for the holes in the tank. Best of luck and have fun. The plumbing is one of my favorite parts of setting up a new tank.
 
You should buy the drain kit that is specific for your tank. That will take a lot of the work out of the equation for you. Then after that you just nees to figure out what fittings and piping you need to get it to the sump
 
You should buy the drain kit that is specific for your tank. That will take a lot of the work out of the equation for you. Then after that you just nees to figure out what fittings and piping you need to get it to the sump



I have the drains and returns it's the piping I don't know how to do
 
Yes
I already have the bulk heads
Excellent,
Like noted above I would start by mocking up everything, start by placing the sump and Lowe's is your best friend for the next 10 trips...

Here's how to keep mistakes to a minimum.
1. Measure and cut. To ensure that the pipe will be fully seated in its fittings, measure the distance between the shoulders on the fittings at each end of the pipe. ...
2. Prime. ...
3. Dry fit. ... (this is a pain in the rear)
4. Glue. ...
5. Push and twist.
 
Last edited:
Gotcha, well start by installing those. I wouldn't start to plan any other plumbing until you lay everything out sump wise like already mentioned. After you get that done post some more pics and we will be able to assist more for sure.
 
I have the drains and returns it's the piping I don't know how to do
i would take a little time and look around through some build threads on the site and see what you like and don't like to come up with your plan. A few tips would be after you cut your pvc try to clean up any "burs" left from the saw, always use pvc primer, and when you are gluing insert the pipe into the fitting making sure it bottoms out and give it a little bit of a twist to get a good joint. I also always recommend doing a dry fit before permanently gluing.
 
I have the drains and returns it's the piping I don't know how to do
Not saying you need all the tools in this video but it gives you a good idea of "how to"...
 
Go with clear PVC primer and glue for a ultra clean look.
 
Didn't read everyone else's posts so apologize if i'm repeating..
All the tubing and connections get from Home Depot, get a lot and whatever you dont use return. Better than thinking of something while your working at 1 am on it and needing to wait till morning for parts.

Ball Valves, Joints, Tubing, more Joints, more valves, PVC cement and Primer
 
Last edited:
Thank you guys I really appreciate all the help!!

I seen may ideas for the hard plumbing on R2R; wasn't sure really where to start or how to do it.
 
Mandee I myself am getting ready to plumb my new 100 gallon reef tank. What I first did was plenty of research and decided to go with a Herbie style drain method to keep water notice down. After that I did a drawing of how my plumbing was going to run under cabinet. Avoid doing hard 90 degree turns and do soft 45s if possible. Figueroa out if you will be doing hard pvc plumbing or the newer flex tubing. Both have their pros and cons. I myself choose the hard pvc plumbing because of the cleaner look. If hard plumbing unions are important, don't forget a check valve, and decide whether you want to use gate or ball valves (spears has good quality valves.) I used bulkreeksupply.com for informative videos and ended up ordering their red SCH 40 pvc tubing. Good luck!
 
make sure when you are dry fitting and before you take apart and glue make a mark with marker on the pieces that meet each other so when you glue them you match them up and everything fits back the way you had it
 
When I plumbed my old 220. I used a lot of spa pvc flex pipe. Made it simple
 

IF YOU HAD TO TAKE A REEFING EXAM, WOULD YOU PASS?

  • Yes!

    Votes: 32 45.7%
  • Not yet, but I have one that I want to buy in mind!

    Votes: 9 12.9%
  • No.

    Votes: 26 37.1%
  • Other (please explain).

    Votes: 3 4.3%

New Posts

Back
Top