Help building an RODI unit out of two separate units

WhatCouldGoWrong71

Valuable Member
View Badges
Joined
May 19, 2023
Messages
1,475
Reaction score
882
Location
Memphis
What state or country do you live in
Tennessee
Rating - 100%
3   0   0
I am ordering a 7 stage replacement media package. Currently my 4 stage can do 75G a day. I need to up that to at least 150 gallons. I currently have 1 RO membrane but will add a second.

Question 1) I can't locate a plumbing/tds meter diagram anywhere. People say " just look at BRS's site and copy their photos". Their photos don't show you everything. Anyone have or know of something to show how a 7 stage with two RO membranes are plumbed?

Questions 2) Do I have to scrap my 75G membrane and get 2 150G membranes?

Thanks and as always I appreciate all you folks.
 
Here is how their 6-stage system works. What I have seen (not sure if this helps) is configurations where they run the waste water directly into the second membrane. BRS did a video on this and it can save quite a bit of wasted water.

6-Stage_RODI_-_BRS-03.jpg
 

IF YOU HAD TO TAKE A REEFING EXAM, WOULD YOU PASS?

  • Yes!

    Votes: 32 45.7%
  • Not yet, but I have one that I want to buy in mind!

    Votes: 9 12.9%
  • No.

    Votes: 26 37.1%
  • Other (please explain).

    Votes: 3 4.3%
Back
Top