- Joined
- Oct 19, 2021
- Messages
- 501
- Reaction score
- 254
- Location
- miami
- What state or country do you live in
- Florida
Good morning reefers,
I need some help with plumbing my new dual over flow 180G tank. Dual overflows
There's one 1" and one 3/4" bulkheads on each overflow. I was told to use the 3/4 for return 1" for drains.
I basically copied the setup from my old system, but ended up with some issues and need to make modifications to the plumbing setup. The drainage in the overflow is a 1 inch pipe going up about 6 inches into a 1 inch reducer , then a 1-1/2 inch pipe all the way up with 2 elbows then a strainer.
Issue 1: leaks on return lines. Already glued everything so I'm going to have to cut and redo the bulkheads.
Issue 2: I want to run dual RFGs through a T or a Y fitting on each overflow side. But the configuration and height I set my overflow pipe to will not allow me to run a loc-line to the other return slot since the drainage pipe is in the way.
I want to know, what can I do with my drainage pipe in the overflow to give myself more room for my return lines.
Should I remove the two elbows on the 1-1/2" inch drainage pipe and just add the strainer directly on top? Should I get rid of the reducer and just have 1 inch drains? Or would it be better to leave that configuration and just cut a few inches of height to give me the clearance I need up top?
Attached are a few photos to help paint the picture.
Much appreciated!!

I need some help with plumbing my new dual over flow 180G tank. Dual overflows
There's one 1" and one 3/4" bulkheads on each overflow. I was told to use the 3/4 for return 1" for drains.
I basically copied the setup from my old system, but ended up with some issues and need to make modifications to the plumbing setup. The drainage in the overflow is a 1 inch pipe going up about 6 inches into a 1 inch reducer , then a 1-1/2 inch pipe all the way up with 2 elbows then a strainer.
Issue 1: leaks on return lines. Already glued everything so I'm going to have to cut and redo the bulkheads.
Issue 2: I want to run dual RFGs through a T or a Y fitting on each overflow side. But the configuration and height I set my overflow pipe to will not allow me to run a loc-line to the other return slot since the drainage pipe is in the way.
I want to know, what can I do with my drainage pipe in the overflow to give myself more room for my return lines.
Should I remove the two elbows on the 1-1/2" inch drainage pipe and just add the strainer directly on top? Should I get rid of the reducer and just have 1 inch drains? Or would it be better to leave that configuration and just cut a few inches of height to give me the clearance I need up top?
Attached are a few photos to help paint the picture.
Much appreciated!!


