Well I had bought a box of 45s on the advice of BRS and returning them was too much a PITA. Its a tad more complicated this way but the waterflow would be smoother. I am "every gph counts" because due to purchasing limitations and available stock for some of the pieces I needed I went with 3/4" plumbing. Add the 90s and I felt I would be working my pump(s) a bit too hard.
For the future:
I have a few more unions so I may add them in when I do the gluing so I can take out sections and redo it without too much fuss. Most of the items I got for this plumbing is non-returnable or too much of an effort to do so.
With what I have on hand, I think this new config works ok.