I'm about to plumb my 40g build and here's my plan in order of flow:
Glass holes overflow box with bulkhead and 90degree elbow.
Pvc pipe to first 45 degree elbow. Union at elbow (do I need one on each side?)
Pvc pipe through back of stand to second elbow. Union after elbow. Some sort of shut off valve (probably not a ball valve but the kind with a faucet handle).
Pvc going into filter sock.
Sump
Pvc attached to return pump (with a union right there so I can remove pump to clean?
Pvc to 45 degree elbow that will go through back of stand. (Should I put a union here?)
Another 45 degree elbow so pvc is now vertical. A small piece of pvc between the two elbows.
Pvc up to the return, which has a 90 degree elbow connected to the bulkhead.
Glass holes return kit with lock line and a flare nozzle.
Does this sound like a good plan? Should I use slip joints or screw things together? Do I need more/less unions? Any and all advice is welcome. I want to do this right the first time!
Glass holes overflow box with bulkhead and 90degree elbow.
Pvc pipe to first 45 degree elbow. Union at elbow (do I need one on each side?)
Pvc pipe through back of stand to second elbow. Union after elbow. Some sort of shut off valve (probably not a ball valve but the kind with a faucet handle).
Pvc going into filter sock.
Sump
Pvc attached to return pump (with a union right there so I can remove pump to clean?
Pvc to 45 degree elbow that will go through back of stand. (Should I put a union here?)
Another 45 degree elbow so pvc is now vertical. A small piece of pvc between the two elbows.
Pvc up to the return, which has a 90 degree elbow connected to the bulkhead.
Glass holes return kit with lock line and a flare nozzle.
Does this sound like a good plan? Should I use slip joints or screw things together? Do I need more/less unions? Any and all advice is welcome. I want to do this right the first time!