Beefed up builders footing

12” on center 4x4’s in the back @5’ long
12” on center 4x4’s on left footing.
The I-Beam looked a little thin so I added two 2x4’s for more support.

Once my footing dries, I’ll do the same as seen in the pics.

I also put a 2x12 perpendicular to the I-beam for support directly under the tank.

if anyone sees something wrong, do tell!!

8224A409-2826-466A-8986-36C41BF4E565.jpeg 655FE7A3-80C6-42C0-8574-7C905E712889.jpeg 94E3DDBA-8DBF-4E7B-9E03-0AB6040983FA.jpeg
 
Looking good. Way overkill but doesn't look bad at all. Very nice in my opinion.

How deep did you go on the pad?
 
Last edited:
Looking good. Way overkill but doesn't look bad at all. Very nice in my opinion.

How deep did you go on the pad?

ty. I think as a hobbyist, we are use to going overboard haha. I didn’t stop there either, I seen the back and sides were fully supported and there was a potential weak spot towards the front of the tank area. So I drilled a 4x4 perpendicular between the I-Beams and put 2 pier blocks under them. Now I can setup shop with peace of mind :)

I’m not following you with the depth of the pad?

EEC83892-B16A-489B-B154-ABB9D63EEF48.jpeg
 
Looking good. Way overkill but doesn't look bad at all. Very nice in my opinion.

How deep did you go on the pad?

ty. I think as a hobbyist, we are use to going overboard haha. I didn’t stop there either, I seen the back and sides were fully supported and there was a potential weak spot towards the front of the tank area. So I drilled a 4x4 perpendicular between the I-Beams and put 2 pier blocks under them. Now I can setup shop with peace of mind :)

I’m not following you with the depth of the pad?
 
At this point, I keep updating with pics in case someone else needs some ideas on beefing up foundations running parallel to tanks.

ABF90775-7359-4988-8D16-DE6E1947F62F.jpeg 16E8A416-01AA-4C93-8127-98F79BB812BF.jpeg
 
ty. I think as a hobbyist, we are use to going overboard haha. I didn’t stop there either, I seen the back and sides were fully supported and there was a potential weak spot towards the front of the tank area. So I drilled a 4x4 perpendicular between the I-Beams and put 2 pier blocks under them. Now I can setup shop with peace of mind :)

I’m not following you with the depth of the pad?
How thick is the concrete you poured?
 
i went 12” thick, 16” wide, 5’ long with a 4’ rebar. Left the wood around the footing for added support.
Once it's cured I would loose the wood. At least in my area it's termite country. And wood is just an intice.
 
Ever figure out how deep your foundation went?

I never called the city but I asked some family that does construction. He said min 24” deep.

im Going to check the footing a week after setting up the tank. I marked my footing with a color so I can see if it starts sinking. I’ll check it again at the 1mo, 6mo and 1yr mark. If all good, I’m not crawling under again lol
 

IF YOU HAD TO TAKE A REEFING EXAM, WOULD YOU PASS?

  • Yes!

    Votes: 32 45.7%
  • Not yet, but I have one that I want to buy in mind!

    Votes: 9 12.9%
  • No.

    Votes: 26 37.1%
  • Other (please explain).

    Votes: 3 4.3%
Back
Top