Finally started the lighting build.
Figured I’d at least get my the main supports mounted and lagged into the wall along with getting the main vertical beams attached. This also gave me an opportunity to realize I didn’t order a piece.
----
I used 5.5” grip screws to mount the 1515 T-slot beam along the stud. These flat headed lag screws from Lowes worked great.
My only wish was that I had asked 8020 to machine end taps to these. But I tapped these myself using a 5/16” tap I picked up at Lowes. I used 1” long 5/16-18 Button head screws to dig deep into the T-slot. The fit is snug and sturdy -- -as well as plumb.
---
The other thing I learned was to triple check and fully understand what parts need to be assembled first before mounting the vertical rails. I ended up having to unscrew my main support beam three times.
Below the locking mechanism and grip handles are shown installed. As is the unibearing assembling to lift the beam up and down.
---
I also got the right angle pivot assemblies in place.
---
This is where I need to stop for the weekend. I realized I didn’t order a 2 hole straight flat plate to fasten the Aquatic Life hybrid to the lower pivot assembly. Ugh…one piece. Lol.
Oh well.