Well, after a small delay due to life happening, I have an update. I just ran a freshwater leak test and to make sure all my engineering is sound. Everything is running awesome, the C2C overflow is awesome and the BeanAnimal drains are silent and sweet. I just need to drill one last emergency drain and then I'll be ready to roll, finally. It has taken way longer than I thought it would for this design and build but it has been so much fun. I love evey little bit of this hobby.
Now, for the big change-over, hopefully this Sunday. Wish me luck..................
Runnin' the fresh test-
I still have to put the doors back on the stand too. Thanks for looking
Now, for the big change-over, hopefully this Sunday. Wish me luck..................
Runnin' the fresh test-
I still have to put the doors back on the stand too. Thanks for looking
Last edited:




