- Joined
- May 28, 2017
- Messages
- 986
- Reaction score
- 444
I moved my 175 cube in and I am leveling it before I begin plumbing. The tank is 36x36x31 Euro braced. It is on a plywood stand made by glass cages.
The stand is off level by approximately 3/16 forward. How should I go about swimming this. Should I shim the low corners and now worry about the rest of the run, or should I attempt to rip a 36" shim on the table saw?
The stand is off level by approximately 3/16 forward. How should I go about swimming this. Should I shim the low corners and now worry about the rest of the run, or should I attempt to rip a 36" shim on the table saw?

