- Joined
- Dec 31, 2015
- Messages
- 621
- Reaction score
- 207
I have an auto water change system setup with a dos in my garage (live in Florida) and run through the wall to my tank. I want to add another dos for 2 part. Space in my stand is tight. Would there be an issues with 2 part dosing with a dos in the garage and run through RO tubes through the wall?

