I’m drip acclimating an LTA right now.
I have it spot prepped. A cove with an overhang available, rock work on one side, sand on the other. 4” deep sand in the cove.
Question is do I clear out a spot for it to attach to the glass bottom?
I have it spot prepped. A cove with an overhang available, rock work on one side, sand on the other. 4” deep sand in the cove.
Question is do I clear out a spot for it to attach to the glass bottom?
Last edited:



