So I've been getting one joint done per day given the space I have to work with. The long piece is the barrier to my Cryptic chamber. The main flow will go through the small (vertical) piece with the 4 holes. Hopefully minor flow will go through 2 of the holes on the horizontal piece and back out the other 2 holes:
This is my Under Over before the return.
The following horizontal piece is both the first chamber baffle and last. The side with 6 holes is the overflow chamber baffle. Then the other side with the notch cut out is my Under before the return pump in my under over under. The vertical piece is the divider. The top of that piece goes to the outer wall:
I designed my sump to flow in a U from the overflow side back to the overflow side. The cryptic chamber is on the far side of the overflow with the main flow turning back to the return pump path the Cryptic bulkhead in the Hope's that some of that flow will want to go through the 2 holes going into then 2 holes going out of the Cryptic chamber.