Almost everything came in from BRS tonight. It was a pleasant surprise when I got home. I was never notified that it was shipped. I had one major items missing. The Pukani Dry Rock. I'm greatly disappointed. It's kind of a key ingredient to starting the cycle. All of the bags of sand were frozen solid and one of the bags of sand was cut wide open on one end. Should this be of concern?
Tomorrow I'll be stopping in at Home Depot to pick up some piping to start the plumbing this weekend. What type of piping do people prefer? What type of glue is used to fasten PVC piping together?
I'll also be picking up the glass to make the sump. I really wish I didn't have two meetings in NY on Saturday. I'd spend the entire weekend setting up the tank.