What going on everyone. I'll be starting in the next month or so getting everything to get this 100g tank going. I need alittle help with the plumbing; Idk if I should do a 3 hole drain system on the side of the tank. Also the hole size I should drill. The sides of the tank are 18' also so idk if 3 holes will work.

