New to the forum, thought i would post my progress of my build. Havent been in the hobby in about 5 years. decided it was time to get back on the horse. got a 40 breeder, just received my drill bit in the mail along with bulkheads and over flow box, got my baffles in the sump. so slowly but surely it should be ready for water in about 2-3 weeks. still waiting for lighting and mag pump... almost there.



