I've decided to tidy up my wiring for all my sump gear a little bit.
I'm calling this the first phase (excuse the pun
)
so now i just need to build the assembly and get everything converted over, ill be double checking the total amp output for each circuit just to make sure i won't have an overload due to excess draw from any equipment. the lighting I'm going to keep on it's own circuit.
I'm calling this the first phase (excuse the pun
)so now i just need to build the assembly and get everything converted over, ill be double checking the total amp output for each circuit just to make sure i won't have an overload due to excess draw from any equipment. the lighting I'm going to keep on it's own circuit.

