Osc help

Rogergolf66

Active Member
View Badges
Joined
Feb 1, 2013
Messages
197
Reaction score
76
Location
Spring hill florida
Rating - 0%
0   0   0
simple but want to be sure. I have 2 powerheads I want them both to run for 1 min together them one off other still on for 8 min then switch on/off then I would like a rest period of 2 min if possible. Then repeat all over again. Is this possible? If not I don’t need the rest period.

Help with the coding would be great

I was thinking something like but it’s not really what I want and I don’t think it will repeat correctly since total min are different.

001:00/008:00/008:00
002:00/008:00/008:00
 
This is close. It would be both pumps on, right pump on, both off, left pump on and is a 19 minute cycle. I'll type it out using N, B, L, and R for neither, both, left, and right pumps by minute.

PL: 001:00/010:00/008:00 Then OFF
PR: 009:00/0010:00/000:00 Then OFF

BRRRRRRRRNNLLLLLLLL

@AquaticJamaica, OSC is an Apex command, though I don't know if there may be another controller that also uses an OSC command.
 
This is close. It would be both pumps on, right pump on, both off, left pump on and is a 19 minute cycle. I'll type it out using N, B, L, and R for neither, both, left, and right pumps by minute.

PL: 001:00/010:00/008:00 Then OFF
PR: 009:00/0010:00/000:00 Then OFF

BRRRRRRRRNNLLLLLLLL

@AquaticJamaica, OSC is an Apex command, though I don't know if there may be another controller that also uses an OSC command.

Worked great thx for the help
 

IF YOU HAD TO TAKE A REEFING EXAM, WOULD YOU PASS?

  • Yes!

    Votes: 32 45.7%
  • Not yet, but I have one that I want to buy in mind!

    Votes: 9 12.9%
  • No.

    Votes: 26 37.1%
  • Other (please explain).

    Votes: 3 4.3%

New Posts

Back
Top