Outlet on every 6 days

  • Thread starter Thread starter kaxt
  • Start date Start date
  • Tagged users None

Users Who Are Viewing This Thread (Total: 0, Members: 0, Guests: 0)

kaxt

Community Member
View Badges
Joined
Jan 8, 2019
Messages
55
Reaction score
57
Rating - 0%
0   0   0
I have a solenoid (not a SV-1) on my water line that feeds my RODI system. The solenoid is plugged into an outlet on my eb8. I also have a water softener that runs every 6th night for my well water. I want to program the solenoid to energize every 6th night so that it runs over night the day before my water softener runs. I can't figure out how to do this. Any help would be appreciated. Thanks
 
That’s not possible. The Apex can be programmed do do things based on the day of the week, but not every x days.

If you can run your water softener on the same day every week, then you can coordinate the two events as you desire.
 
Thanks for the replies. I can't set the water softener to run on a set day. The frequency of the cycle has to be a whole number divided from 12. So 1, 2, 3, 4, 6, or 12 days. Kinda disappointing that it won't work out the way I thought it could.
 

IF YOU HAD TO TAKE A REEFING EXAM, WOULD YOU PASS?

  • Yes!

    Votes: 32 45.7%
  • Not yet, but I have one that I want to buy in mind!

    Votes: 9 12.9%
  • No.

    Votes: 26 37.1%
  • Other (please explain).

    Votes: 3 4.3%
Back
Top