Sep 27, 2015 #1 pastelball Active Member View Badges Joined Mar 10, 2015 Messages 301 Reaction score 80 Rating - 0% 0 0 0 Ok, so had the tank drilled for a 1"1/2 bulkhead. When the 90 elbow is on its over the rim. I don't like it turned to much as then the water level will be even lower. So do I cut the 90 down or do I get a over flow box and silicon it in?
Ok, so had the tank drilled for a 1"1/2 bulkhead. When the 90 elbow is on its over the rim. I don't like it turned to much as then the water level will be even lower. So do I cut the 90 down or do I get a over flow box and silicon it in?