I have a 125g that has dual corner overflows currently utilizing dursos for noise control.
I am upgrading to a 240g with dual corner overflows and want to try running either a Herbie or Bean Animal system. From my understanding both of these will require a gate valve on the primary drain's vertical line.
The overflows each have a 1" and a 3/4" bulkhead.
As with everyone else - silence is the name of the game. So how would you do it?
I am upgrading to a 240g with dual corner overflows and want to try running either a Herbie or Bean Animal system. From my understanding both of these will require a gate valve on the primary drain's vertical line.
The overflows each have a 1" and a 3/4" bulkhead.
As with everyone else - silence is the name of the game. So how would you do it?

