- Joined
- Apr 19, 2019
- Messages
- 2,556
- Reaction score
- 2,082
So I am completely new to plumbing tanks I am about to start my first one and i will be using an internal overflow box with a hole that leads down into my sump. I really want to see if I can get away with drilling one hole and have an east point a to point b pipeline. I have a 60g cube and I plan on pumping anywhere from 400-600 gph. Would the example system I provided be a viable option for an overflow? Sorry if this does not make complete sence I cant seem to wrap my head around it
I havent found the right piping or bulkhead yet, however my overflow box is rated for 1000 gph

