I just started trying to plumb my Modular Marine overflow and man it’s a tight fit on everything! What do you guys think of this layout for the three pipe system?
At this stage, my emergency drain in the middle just has a random short pipe on it til I cut a full length one. My left side overflow is my Open Channel overflow (the one that allows in air and doesn’t go full siphon) and will have a 90 and a cap on the tee. The cap may have an airline if I can make that work somehow without having to prop my lid open.
Is there anything wrong or silly here? First time doing a beananimal style three hole overflow.
At this stage, my emergency drain in the middle just has a random short pipe on it til I cut a full length one. My left side overflow is my Open Channel overflow (the one that allows in air and doesn’t go full siphon) and will have a 90 and a cap on the tee. The cap may have an airline if I can make that work somehow without having to prop my lid open.
Is there anything wrong or silly here? First time doing a beananimal style three hole overflow.

