plumbing question here

richiero

Well-Known Member
View Badges
Joined
Mar 4, 2013
Messages
886
Reaction score
355
Location
new york
Rating - 0%
0   0   0
i am looking to change up my maifold to give me working room over my fuge section of my sump i was thinkg about sawaping out my current pvc 1/2" 1/4 turn valves with john quest 1/4 turn 3/8" valves which will be tapped in my 3/4 manifold pipe. will the 3/8" be good enough to power my 2 little fishes reactors that have pellets and carbon? thank you for any advice guy and girls..

.
IMG_0440.jpg
IMG_0441.jpg
 
I'm not sure you could get the 200-300gph necessary for the reactors through them without a lot of pressure. I think you would need to throttle back your return into DT to get enough back pressure.

Cheers, Todd
 

IF YOU HAD TO TAKE A REEFING EXAM, WOULD YOU PASS?

  • Yes!

    Votes: 32 45.7%
  • Not yet, but I have one that I want to buy in mind!

    Votes: 9 12.9%
  • No.

    Votes: 26 37.1%
  • Other (please explain).

    Votes: 3 4.3%

New Posts

Back
Top