looking at redoing my returns and have a question. Currently have a 1” return line that I Tee into two 1” lines to go to separate returns where it then reduces to 3/4”. Is that the best way to plumb or should I re-do and reduce to 3/4” when I tee the main 1” line? Or does it not really matter?

