Hello everyone. I am about to replumb my sump and change my layout up for other equipment I’ve bought. Would it be a issue if I plumbed both drains into 1 like in the drawing. I am running the Bernie overflow and 1 drain is the main and the other is a emergency. Any feedback would be greatly appreciated.



