I just resealed my 210 and I have a couple of questions. First I'd like to leak test it before I move it into my basement. In order to leak test I need to install the bulkheads and some PVC so the water doesn't drain out the drilled bottom holes. Installing the bulkheads requires the tank to be off the floor. I have the tank on 4x4s so the bulkheads are not touching the ground. My question is this...can I safely test the tank with only 4x4s running around the exterior edges of the tank and no support in the middle? I have attached a picture, the ends of the tank are not supported in the picture but would be before I fill.
My next question is I have 4 drilled holes with 1 inch bulkheads. The included plumbing uses 1 inch drains and 3/4 inch returns. In order to use 3/4 inch returns I'd have to install bushings into the bulkeads. Can I just change the returns out to 1" without any issue? I don't mind using bushings but I'm not sure if PVC cement can be used in the bulkheads or not. I'm not sure what the bulkheads are made from. I bought them at the LFS.
My next question is I have 4 drilled holes with 1 inch bulkheads. The included plumbing uses 1 inch drains and 3/4 inch returns. In order to use 3/4 inch returns I'd have to install bushings into the bulkeads. Can I just change the returns out to 1" without any issue? I don't mind using bushings but I'm not sure if PVC cement can be used in the bulkheads or not. I'm not sure what the bulkheads are made from. I bought them at the LFS.

