- Joined
- Nov 4, 2018
- Messages
- 377
- Reaction score
- 158
Hi all,
I live outside of the USA and I could actually get some items from Amazon and have it shipped here. Lead time is usually 2-4 weeks, so I would get what I need usually every 4-6 months. I'm considering on buying Poly-Filter and either I'm getting the 12x12 one or a 3-pack of 4x8. I'm thinking of using 4x4s per instance of copper removal after a water change (a wavemaker would be pointing to the polyfilter). Would this work or is it "underdosed"? Thanks!
I live outside of the USA and I could actually get some items from Amazon and have it shipped here. Lead time is usually 2-4 weeks, so I would get what I need usually every 4-6 months. I'm considering on buying Poly-Filter and either I'm getting the 12x12 one or a 3-pack of 4x8. I'm thinking of using 4x4s per instance of copper removal after a water change (a wavemaker would be pointing to the polyfilter). Would this work or is it "underdosed"? Thanks!


