- Joined
- Jul 4, 2019
- Messages
- 527
- Reaction score
- 164
- Location
- San Diego
- What state or country do you live in
- California
There is an 8 hr planed power outage in about a week in San Diego. I have a 65g controlled by my apex and 2 x eb832s. My powerheads are AI, return is a Varios 4, one DOS and a generic heater. I obviously have a lot of other stuff plugged in, but what size APC UPS backup should I need?

