So where should I place my 3 16000 lb screw Jack's for this 220.? The total floor span is 14 ' from foundation to foundation wall, I'm wanting to place them right in the center at 7'. This would put them a little to the left of the tank center. Red is the foundation walls yellow is the interior walls purple is the proposed screw Jack's. Thought? Distance is approximate but close.

Capture.PNG
 
what is your foundation made from? do you not have a center beam? send over a pic of what it looks actually....if ur doing structural then it's hard to give advice from a drawing
 
what's your floor supports look like....what's ur floor made from, and what are you jacking off of?
 
i have a center beam, and my exteroir foundation wall is core filled cinder block. i have tongue and grove 3/4" OSB subfloor on top of 2 x 10 joists at 16" oc.
 

IF YOU HAD TO TAKE A REEFING EXAM, WOULD YOU PASS?

  • Yes!

    Votes: 32 45.7%
  • Not yet, but I have one that I want to buy in mind!

    Votes: 9 12.9%
  • No.

    Votes: 26 37.1%
  • Other (please explain).

    Votes: 3 4.3%
Back
Top