I recently purchased a 90 RR with 2 1"bulkhead holes on the bottom; I am looking to setup a herbie by using the included plumbing and wanted a quick critic of my planed setup. Use the 1" pipe as the main drain, 6" below the overflow with a strainer. For the emergency drain place it within 1/2 of the overflow no stainer using the included 1 1/2" pipe reduced to 1" near the bulkhead.
I plan on drilling the return in the back later, but for a herbie does anything stand out as potentially problematic?
Thanks in advanced!
I plan on drilling the return in the back later, but for a herbie does anything stand out as potentially problematic?
Thanks in advanced!

