- Joined
- Jun 17, 2019
- Messages
- 9
- Reaction score
- 24
- What state or country do you live in
- Connecticut
As I dream and plan for the eventual tank upgrade, I am thinking about plumbing and specifically hooking up reactors for use in my sump.
In order to limit the amount positive pressurized tubing, fittings, and equipment waiting to leak - I got to thinking about using a reactor via suction as opposed the the typical pump blowing water into the reactor. Obviously this means a second pump.
Does anybody do this? What pitfalls am I missing?
In order to limit the amount positive pressurized tubing, fittings, and equipment waiting to leak - I got to thinking about using a reactor via suction as opposed the the typical pump blowing water into the reactor. Obviously this means a second pump.
Does anybody do this? What pitfalls am I missing?


